SS RNPP, receiving inspection of fresh Westinghouse fuel for VVER-440

In September 2023, NFC STE specialists participated in the receiving inspection of the first full reload batch of fresh Westinghouse VVER-440 fuel at SS “RNPP”. The reload batch includes both working assemblies (WA) and fuel assemblies (FA), designed, manufactured and supplied for the needs of Ukrainian NPPs within a short period of time. All assemblies supplied by Westinghouse have successfully passed the receiving inspection.

« Back